04 · Control systems · Power and networks

LV and MV power distribution and industrial networks

We design, build and commission LV and MV power distribution and industrial networks for plants across the UAE, Saudi Arabia and the wider GCC. That covers switchgear, MCCs, drives, UPS and 24 V DC, together with PROFIBUS, PROFINET, Modbus and EtherNet/IP networks built for redundancy.

980 MWHVDC platform PMS commissioned
PRPZero-switchover redundant networks
17+ yearsEngineering in the GCC
LV and MV power distribution with a redundant industrial networkPOWER PATHCONTROL NETWORKMV switchgearIEC 62271 · relays IEC 61850TransformerMV / 400 V, earthed neutralLV switchboardIEC 61439 · Form 4bMCC / VFDIEC 61800UPS / 24 V DCIEC 62040MControls, I/OPMS controllerredundant S7-400HLAN ALAN BPRP · IEC 62439-3 · zero switchoverRelaysGOOSE, MMSRemote I/OPROFINETDrives, MCC, UPSPROFINET · Modbus TCP · EtherNet/IPFibre between buildings, copper in panels
MV to LV power path beside a PRP redundant control network linking the PMS, protection relays, remote I/O and drives.
Overview

What LV and MV power distribution and industrial networks cover

Every control system depends on two things it does not control itself: clean, protected power and a network that carries data on time. We design, build, test and commission both, from the MV incomer down to the 24 V DC that feeds a single I/O card, and from the plant backbone down to the last field device.

LV and MV power distribution and industrial networks sit underneath every PLC, DCS and SCADA system we deliver. If a breaker trips on nuisance harmonics, or a switch loop takes a second to heal, the best control logic in the world will still drop the plant. So we treat power and networks as part of the automation scope, not as somebody else's problem at the battery limit.

On TenneT's 980 MW HVDC offshore wind converter platform, built by McDermott at its Jebel Ali yard in Dubai, we commissioned the control system that runs the platform's power management system (PMS). That work covered redundant Siemens S7-400H controllers, PRP redundant networks, PROFINET over multimode fibre and redundant 24 V DC supplies. The same approach applies to substations, process plants, utilities and infrastructure across the UAE, Saudi Arabia, Qatar, Oman, Kuwait and Bahrain.

POWER

LV and MV distribution

Switchgear, switchboards, motor control centres, transformers and the protection that keeps faults small and selective.

CONTROL

Drives, UPS and DC

Variable frequency drives, UPS systems and 24 V DC trains that keep instruments, controllers and networks alive through disturbances.

DATA

Industrial networks

PROFIBUS, PROFINET, Modbus and EtherNet/IP, with redundant topologies, certified cabling and segmentation designed for the process.

Deep dive 1

LV switchboards, MCCs and MV switchgear

Distribution equipment is chosen once and lived with for 25 years or more. Getting the rating, separation and protection right at design stage avoids derating, nuisance trips and unsafe maintenance later.

LV switchboards and motor control centres to IEC 61439

IEC 61439 replaced the old type-tested and partially type-tested assembly concept with design verification. The original manufacturer proves the design for temperature rise, short-circuit withstand, dielectric strength and clearances. The panel builder then carries out routine verification on every assembly before it ships. Part 2 covers power switchgear and controlgear assemblies, which includes most switchboards and MCCs. Internal arc behaviour is assessed separately under IEC TR 61641.

Forms of separation describe how live parts are segregated inside the assembly. Form 1 has no internal separation. Form 2 separates busbars from functional units. Form 3 also separates functional units from each other. Form 4 adds separation of outgoing terminals, so one feeder can be worked on while its neighbours stay live. For critical process MCCs we normally recommend Form 4b with withdrawable units.

Intelligent MCCs

An intelligent MCC replaces hardwired start, stop, run and trip signals with motor management relays on PROFINET, Modbus TCP or EtherNet/IP. Each starter then reports current, thermal capacity, trip cause, running hours and start counts. This cuts marshalling and cabling, and gives maintenance teams real condition data. The trade-off is that the network becomes part of the motor control path, so redundancy and a hardwired emergency stop remain essential.

MV switchgear to IEC 62271

IEC 62271-200 covers AC metal-enclosed switchgear from above 1 kV up to and including 52 kV, typically 6.6, 11 and 33 kV in the GCC. Two classifications matter most. Internal arc classification (IAC), such as AFLR, states which sides of the panel are tested as safe for personnel during an internal arc. Loss of service continuity category (LSC), such as LSC2, states how much of the board stays energised when one compartment is opened. Circuit breakers themselves are tested to IEC 62271-100.

ItemWhat to specifyTypical reference
LV switchboardRated current at site ambient, short-circuit rating, form of separation, IP rating IEC 61439-2Form 4b, 50 kA 1 s
MCCStarter type, coordination type, withdrawable or fixed, motor management relay protocol IEC 60947-4-1Type 2 coordination
MV switchgearRated voltage, short-time current, IAC class, LSC category IEC 62271-200IAC AFLR, LSC2
Protection relaysFunctions, CT and VT ratios, communication and time sync IEC 60255IEC 61850, PTP or SNTP
Deep dive 2

Protection, power management, drives and UPS

Protection clears faults. Power management keeps the plant running when generation or supply is lost. Drives and UPS systems shape the quality of the power that reaches the process.

RELAYS

Protection and IEC 61850

Numerical relays to IEC 60255 provide overcurrent, earth fault, differential and distance protection. IEC 61850 replaces hardwired interlocks with GOOSE messages and gives SCADA a structured data model over MMS. A clean SCL configuration file is the single source of truth for the substation.

PMS

Power management and load shedding

A PMS monitors generation and import capacity against load. When a generator or incomer trips, it sheds pre-assigned loads in priority order fast enough to stop frequency collapse. It also handles synchronising, load sharing and controlled restart.

VFD

Variable frequency drives

Drives to the IEC 61800 series save energy and give soft starting, but they inject harmonic currents. IEEE 519 sets voltage and current distortion limits at the point of common coupling. Mitigation options include 12 or 18 pulse rectifiers, active front ends and active or passive filters.

UPS

UPS systems to IEC 62040

IEC 62040-3 classifies UPS performance. Double conversion units (VFI) isolate the load from mains disturbances and suit control and safety systems. We size autonomy, battery type and bypass arrangement around what the load needs to shut down safely or ride through.

24 V DC

Redundant 24 V DC

Controllers, I/O and switches live on 24 V DC. Two supplies feed a redundancy module so that one can fail or be replaced without interruption. Electronic circuit breakers on each output trip selectively, even on a current-limited supply.

EARTH

Earthing and lightning

Low-voltage earthing follows IEC 60364, substation grids are often designed to IEEE 80, and lightning protection follows IEC 62305. Separate clean instrument earths, bonded at one point, keep noise out of signals and network screens.

Reference: PMS on TenneT's 980 MW HVDC platform

On the TenneT converter platform, two redundant S7-400H systems shared the work. KE0001 ran integrated monitoring and control (IMAC) and KE0002 ran the power management system. Each used CPU 410-5H processors, PS 405 power supplies and CP 443-1 communication processors. ET 200SP HA distributed I/O connected over PROFINET on LC multimode fibre.

The 24 V DC supply used SITOP PSU6200 trains feeding a SITOP RED1200 redundancy module, with E-T-A REX12D electronic circuit breakers on the outgoing circuits. Interface relays were marshalled on push-in terminals, and every device carried an IEC 81346 reference designation, so drawings, labels and software tags all matched. That discipline made loop checks and fault finding much faster during commissioning.

Deep dive 3

Industrial networks compared: PROFIBUS, PROFINET, Modbus and EtherNet/IP

Most of these protocols are standardised as communication profiles under IEC 61158 and IEC 61784. The right choice depends on the control platform, the devices, the speed needed and what is already installed.

NetworkPhysical layer and speedWhere it fits
PROFIBUS DPRS-485 copper, 9.6 kbit/s to 12 Mbit/s, up to 126 addresses IEC 61158Remote I/O, drives and MCCs on existing Siemens plants
PROFIBUS PAMBP, 31.25 kbit/s, power and data on one pair, intrinsically safe options IEC 61158-2Field instruments in hazardous areas
PROFINETEthernet, 100 Mbit/s full duplex, RT and IRT classes, conformance classes A to C IEC 61784-2New Siemens and multi-vendor plants, remote I/O, drives
Modbus RTURS-485 serial, master and slave polling, simple register mapPackaged equipment, meters, gas detection panels
Modbus TCPEthernet, client and server on TCP port 502Third-party skids, UPS, generators, relays without IEC 61850
EtherNet/IPEthernet with CIP, implicit I/O and explicit messaging, DLR ringsRockwell-based plants and devices that support CIP

Topologies and redundancy

A line topology is cheap but one failed device or cable cuts off everything downstream. A ring closes the line so traffic can take the other way round. Media Redundancy Protocol (MRP, IEC 62439-2) manages PROFINET rings and recovers in up to 200 ms in a standard ring. That is fine for most process control but not for every application. EtherNet/IP uses Device Level Ring (DLR) for the same purpose.

Where no interruption at all is acceptable, IEC 62439-3 gives two zero-recovery methods. Parallel Redundancy Protocol (PRP) sends every frame over two fully independent networks, LAN A and LAN B, and the receiver discards the duplicate. High-availability Seamless Redundancy (HSR) does the same in a single ring, sending frames both ways. On the TenneT platform we used SCALANCE XF204-2BA DNA switches, where DNA means dual network access, to connect devices to PRP networks.

Fibre or copper

Copper Ethernet is limited to 100 m per segment and picks up interference near drives and MV cables. Fibre is immune to electromagnetic interference, gives galvanic isolation between buildings with different earth potentials, and reaches far further. Multimode OM3 or OM4 suits links inside a plant. Single-mode OS2 suits long runs between substations and process areas. We normally use copper inside panels and fibre between them.

Good network practice

  • Separate control, safety and business traffic into zones
  • Redundant paths routed on different cable trays
  • Managed switches with diagnostics mapped into the DCS
  • Certified cabling with test reports for every link
  • Network drawings and IP plans kept under change control

Common problems we find

  • Flat networks with office PCs on the control LAN
  • Both rings in the same tray, so one fire cuts both
  • PROFIBUS without correct termination or screen earthing
  • Unmanaged switches with no diagnostics at all
  • Duplicate IP addresses and undocumented devices

Network design, testing and segmentation

Design starts with a traffic and availability analysis. We work out update times, device counts per segment and which links need redundancy. Copper cabling is certified with a field tester against ISO/IEC 11801 channel limits, with PROFINET installations also checked against the PROFIBUS and PROFINET International installation guidelines. Fibre is tested for insertion loss with a light source and power meter, and with an OTDR on long or spliced runs, following ISO/IEC 14763-3. PROFIBUS segments are checked with a bus analyser for signal quality, termination and reflections.

Segmentation follows the zones and conduits model in IEC 62443-3-2. Safety systems, basic process control, power management and business networks sit in separate zones, with firewalls or data diodes on the conduits between them. This contains faults and broadcast storms as well as cyber threats. For deeper security work see our page on control system upgrades and OT cyber security.

Standards

Standards for power distribution and industrial networks

We work to the edition of each standard named in the project specification. These are the ones that come up most often.

LV assembliesIEC 61439

Design and routine verification of LV switchboards, MCCs and distribution boards.

MV switchgearIEC 62271-200

Metal-enclosed switchgear above 1 kV to 52 kV, including IAC and LSC.

ProtectionIEC 60255

Measuring relays and protection equipment, functional and environmental tests.

Substation commsIEC 61850

Data model, GOOSE, MMS, SCL configuration and conformance testing.

DrivesIEC 61800

Adjustable speed drive ratings, EMC and electrical safety.

HarmonicsIEEE 519

Voltage and current distortion limits at the point of common coupling.

UPSIEC 62040

UPS safety, EMC and performance classification.

FieldbusIEC 61158 / 61784

Fieldbus and industrial Ethernet protocols and their profiles.

RedundancyIEC 62439

High-availability networks, including MRP, PRP and HSR.

Process

How we deliver power and network scopes

The same steps apply whether we are supplying a new MCC and network, or upgrading a live plant one feeder at a time.

  1. Survey and requirements. We review single line diagrams, load lists, network drawings and the client specification, and survey existing equipment on site.
  2. Studies. Load flow, short circuit, protection coordination, arc flash and harmonic studies set equipment ratings and relay settings.
  3. Network architecture. We define topology, redundancy, zones, IP and device naming plans, and select switches and media.
  4. Detailed design. Panel general arrangements, schematics, cable schedules and IEC 81346 designations are produced and approved.
  5. Build and FAT. Panels are built and routine verified, then factory tested with the control system to IEC 62381.
  6. Installation and cable testing. Copper and fibre links are certified and earthing is measured before energisation.
  7. Commissioning and SAT. We energise in stages, inject relays, test load shedding, force network failures and prove redundancy.
  8. Handover. As-built drawings, test records, settings files and training are handed to operations and maintenance.
Deliverables

Documents you receive

Every scope ends with a documented, traceable installation that your own team can maintain.

DocumentContent
Single line diagramsMV and LV distribution with ratings, protection and interlocks
Power system studiesLoad flow, short circuit, coordination, arc flash and harmonics IEEE 519
Relay settings filesSettings, logic and SCL files for every IED IEC 61850
Network architectureTopology, redundancy, zones, conduits, IP and VLAN plan IEC 62443-3-2
Cable test reportsCertification results for every copper and fibre link ISO/IEC 11801
Panel documentationGA drawings, schematics, routine verification records IEC 61439
FAT and SAT recordsSigned test procedures, punch lists and redundancy test results IEC 62381
GCC conditions

Power and networks in GCC site conditions

Equipment that works in a European plant can overheat or fail early in Dubai, Abu Dhabi, Riyadh or Doha. Design has to start from the real site ambient.

HeatAmbient temperatures above 50 °C mean derating switchboards, drives, UPS batteries and power supplies. We check the manufacturer's derating curves and size cooling for the room, not the brochure.
Dust and sandFine dust blocks filters and drive heatsinks. We specify IP ratings to IEC 60529, positive pressure rooms and filter maintenance intervals.
Humidity and saltCoastal sites in the UAE, Qatar, Kuwait and Bahrain bring condensation and salt corrosion. Anti-condensation heaters and conformal coated electronics help.
Hazardous areas and client specsEquipment in classified areas follows IEC 60079 and IECEx or ATEX certification. We work to client standards such as Saudi Aramco SAES, ADNOC, QatarEnergy and PDO specifications.
FAQ

Power and networks: common questions.

Short answers to what clients ask us most. For anything specific to your plant, talk to an engineer.

What is the difference between LV and MV power distribution?

Low voltage (LV) covers systems up to 1,000 V AC, such as 400 V switchboards and MCCs built to IEC 61439. Medium voltage (MV) covers roughly 1 kV to 52 kV, such as 11 kV and 33 kV switchgear built to IEC 62271-200. MV feeds transformers that step down to LV for motors, lighting and control power.

What are forms of separation in an LV switchboard?

Forms of separation, defined in IEC 61439-2, describe how busbars, functional units and terminals are segregated inside an assembly. They range from Form 1 with no separation to Form 4 where each feeder and its terminals are separated. Higher forms let you work on one circuit while others stay live, which matters for continuous process plants.

Is PROFINET better than PROFIBUS?

PROFINET is faster, uses standard Ethernet, supports ring and PRP redundancy and gives richer diagnostics, so it is the usual choice for new plants. PROFIBUS DP still works well and is widely installed, and PROFIBUS PA remains common for instruments in hazardous areas. Many upgrades keep PROFIBUS PA in the field and move the backbone to PROFINET.

What is the difference between MRP, PRP and HSR?

MRP (IEC 62439-2) manages a single ring and reroutes traffic after a break, typically within 200 ms. PRP and HSR (IEC 62439-3) send duplicate frames over two paths so that a single failure causes no interruption at all. PRP uses two separate networks, while HSR uses one ring with frames sent in both directions.

How does load shedding work in a power management system?

The power management system continuously compares available generation or import capacity with running load. If a generator or incomer trips, it immediately opens breakers on pre-assigned loads in priority order so the remaining supply is not overloaded. This prevents frequency collapse and a full plant blackout.

Do variable frequency drives need harmonic filters?

Not always, but large drive loads often push distortion above the IEEE 519 limits at the point of common coupling. A harmonic study shows whether mitigation is needed. Options include line reactors, multi-pulse rectifiers, active front end drives and active filters.

Should industrial networks use fibre or copper?

Use copper inside panels and for short runs up to 100 m away from strong interference. Use fibre between buildings, near MV equipment and drives, and for long runs, because it is immune to electrical noise and isolates different earth potentials. Multimode fibre suits most plant links and single-mode suits long distances.

Do you carry out power and network work in Saudi Arabia and Qatar?

Yes. We work across the GCC, including the UAE, Saudi Arabia, Qatar, Oman, Kuwait and Bahrain, from our offices in Dubai and the UK. We follow the client's own specifications, such as Saudi Aramco, ADNOC, QatarEnergy and PDO standards, alongside the relevant IEC standards.

Request a quote

Request a quote for power distribution and industrial network work

Send us your single line diagram, network drawings and scope, and we will reply with a clear technical and commercial proposal. We cover design, panel supply, cable testing, commissioning and fault finding for LV and MV power distribution and industrial networks across the UAE, Saudi Arabia, Qatar, Oman, Kuwait and Bahrain. Call +971 54 774 6012 or message us on WhatsApp at +44 7746 964222.

  • Single line diagrams for MV and LV distribution
  • Load list with motor ratings and drive loads
  • Existing network architecture drawings
  • Control platform and protocols in use
  • Redundancy and availability requirements
  • Client and project specifications (ADNOC, Aramco, etc.)
  • Site location, ambient and hazardous area classification
  • Scope split: design, supply, install, test or commission
  • Required studies (short circuit, coordination, harmonics)
  • Target schedule and site access constraints